桥田桥田
Technical Services
Committed to providing one-stop solutions for our customers
After-Sales Service
  • Principle
    Principle
    Customer satisfaction as the first principle
    Quick response
    Fast problem solving
  • After-sales service efficiency
    After-sales service efficiency
    Customer Feedback 30min Response
    Solution 120min Issued
    On-site support 6-12 hours
  • After-sales service commitment
    After-sales service commitment
    One year warranty on electronic components, one to three years warranty on the body
    Lifetime warranty
    Except for man-made reasons
  • After-sales team strength
    After-sales team strength
    Number of service teams 10+ Changchun, Wuhan, Chongqing, Changsha, Guangzhou, etc.
    Resident after-sales personnel and spare parts in key regions
    Technical support
    Free training
Technological Innovation
桥田
  • Patented locking technology
    One locking guarantee: safety platform; two locking guarantee: reset spring, up to 10 times the load of the locking force of the double air-break insurance structure
  • Patented drip-free fluid connectors
    Multi-energy: gas and liquid patented drip-free design, extremely high stability, breaking foreign monopolies
  • Cat3 safety rated electrical features
    One generation ahead of its peers, the quick-change control safety system performance level d category3 is TÜV certified.
  • Autonomous high insertion and extraction life probes
    High lifespan: max1 million times; multiple types: high and low voltage, strong and weak power, network, vision, servo signal...
Service Hotline
Dear customer, Thank you very much for choosing Qiaotian products and services. After receiving the feedback of the problem, we will deal with it and contact you as soon as possible.
桥田
After-sales Enquiry and Complaint Hotline:400-1033-880
  • 桥田
    Product issues or optimisation suggestions
  • 桥田
    After-sales problem scheduling WeChat
  • 桥田
    Customer Satisfaction Survey
FAQ
  • QInstallation position verification method for assembled ECS systems
    Simulate manual docking with no air pressure and power supply. Smooth full insertion without obvious jamming confirms accurate positioning within floating tolerance range.
    Simulate manual docking with no air pressure and power supply. Smooth full insertion without obvious jamming confirms accurate positioning within floating tolerance range.
    桥田桥田
  • QLubrication requirement for positioning pins and sleeves
    Proper special lubricating grease must be applied on matching surfaces during initial installation and regular maintenance to reduce dry friction and extend service life.
    Proper special lubricating grease must be applied on matching surfaces during initial installation and regular maintenance to reduce dry friction and extend service life.
    桥田桥田
  • QAnti-reverse foolproof design of QCM module assembly
    Special clamping grooves and direction marks are reserved on modules and mounting frames to ensure unidirectional assembly, avoiding short circuit and equipment damage caused by reversed power poles or signal lines.
    Special clamping grooves and direction marks are reserved on modules and mounting frames to ensure unidirectional assembly, avoiding short circuit and equipment damage caused by reversed power poles or signal lines.
    桥田桥田
  • QFluid cleanliness requirements before connecting MTC/QCB/QCT/QCH couplings
    Install filters no less than 100-mesh on all pipelines to remove impurities, preventing valve core jamming and sealing surface scratch damage.
    Install filters no less than 100-mesh on all pipelines to remove impurities, preventing valve core jamming and sealing surface scratch damage.
    桥田桥田
  • QConsequences of undersized driving cylinders
    Insufficient thrust fails to realize full fitting, resulting in air leakage, blocked fluid circulation and poor signal contact. Connectors may even pop open instantly after pressure boosting.
    Insufficient thrust fails to realize full fitting, resulting in air leakage, blocked fluid circulation and poor signal contact. Connectors may even pop open instantly after pressure boosting.
    桥田桥田
  • QWeekly preventive maintenance items for ECS systems
    -Check foreign matters and consistent height of signal pins
    -Inspect air leakage at fitting positions by hand touch
    -Clean sundries on docking surfaces
    -Check abnormal gaps after full connection
    -Check foreign matters and consistent height of signal pins
    -Inspect air leakage at fitting positions by hand touch
    -Clean sundries on docking surfaces
    -Check abnormal gaps after full connection
    桥田桥田
  • QMonthly in-depth maintenance items for ECS systems
    -Refill lubricating grease for positioning pins and sleeves
    -Tighten loose mounting screws
    -Check fastening status of fluid joints
    -Confirm stability of positioning assemblies
    -Refill lubricating grease for positioning pins and sleeves
    -Tighten loose mounting screws
    -Check fastening status of fluid joints
    -Confirm stability of positioning assemblies
    桥田桥田
  • QCommon causes for ECS docking jamming failure
    Long-term operation leads to structural displacement exceeding ±2mm floating compensation range. Solution: recalibrate installation positions of cylinders and fixtures.
    Long-term operation leads to structural displacement exceeding ±2mm floating compensation range. Solution: recalibrate installation positions of cylinders and fixtures.
    桥田桥田
124567 GO
Submitted successfully
make certain
Shanghai Qiaotian Intelligent Equipment Co.,Ltd
Address:Building 4, No. 55, Bixi Road, Minhang District, Shanghai, China
Business Consultancy:400-105-3088
After-Sales Support:400-103-3880
Contact Us:021-67105330
Zhejiang Qiaotian Intelligent Equipment Co.,Ltd
Address:North Side, 1st Floor, Factory Building 6, No.1 Weizhong Road, Jiashan County, Jiaxing City, Zhejiang Province, China
WeChat Official Account
WeChat Official Account
WeChat Channel
WeChat Channel
Copyright © 2026 Shanghai Qiaotian All Rights Reserved.Shanghai ICP No. 16054250  SiteMap